Skip to content

Service

Modern Work & Microsoft 365

We move organisations onto Microsoft 365 without the six-month stall. Tenant design, mail and file migration, device management with Intune, and an adoption programme that gets usage past the first month.

What clients typically see

Typical migration window
6–10 weeks
Typical migration window
Mailbox cutover downtime
< 1 hour
Mailbox cutover downtime
Licence spend recovered
12–28%
Licence spend recovered

Ranges drawn from comparable engagements. We agree the baseline and the measurement method with you during discovery, before anything is promised in a statement of work.

Capabilities

What the engagement covers

Scope is assembled from these, sized to your estate. You are never charged for a workstream you do not need.

  • Tenant architecture and multi-geo configuration
  • Exchange, Google Workspace, and file-share migration
  • SharePoint and Teams information architecture
  • Intune device enrolment and compliance baselines
  • Governance, retention, and eDiscovery policy
  • Adoption, training, and champion enablement

Delivery path

How the work runs

A typical shape. Phases compress or extend with the size of your estate, and each one ends in something you can review.

  1. 01

    Assess

    Tenant, identity, and licence audit against your current estate.

  2. 02

    Design

    Target architecture, governance model, and migration waves.

  3. 03

    Migrate

    Pilot wave, then batched cutover with rollback at every step.

  4. 04

    Adopt

    Role-based training, champions programme, and usage reporting.

Start with a conversation about your estate

Thirty minutes with a consultant who has delivered modern work & microsoft 365 before. You will leave with a view on sequence, effort, and whether this is the right place to spend the budget at all.